BRADLEY COUNTY INSPECTIONS

PRE-CONSTRUCTION CHECKLIST

 

Text Box: Initial that you have read and understand the following items must be accomplished BEFORE construction begins for this site:

_____Silt fence or other sediment barriers has been properly installed along topographical contours down slope of the area to be disturbed prior to any grading, clearing, excavation and/or any other construction activity in which earth will be disturbed.  Soil, sand, rock or other debris will be kept off the roads and storm drains and if for any reason some escapes the construction site, the debris must immediately be physically removed.  Excavated topsoil to be reused must be stockpiled and encircled with properly installed silt fencing.

 

_____This site shall contain a temporary stone construction entrance that shall be used by all traffic to access the site.  The stone shall be ¾  - 3 ½ inch in diameter and shall be kept clean by adding more stone if needed.  The minimum depth will be six (6) inches, width of twenty (20) feet, length of not less than thirty five (35) feet.  (Fifty (50) feet preferable.)

Text Box: Check that you have read and understand the following:

 

 

 

_____Vegetative buffers or other protection must be provided along streams, rivers, and ponds to avoid erosion of banks.

 

 

_____Stabilization measures must be performed within seven (7) days in portions of the site where construction activities have temporarily or permanently ceased, and within fifteen (15) days after final grading.

 

 

_____Designated areas such as non-disturbance forested buffer must be marked off and protected.  Heavy equipment should not be operated or stored, nor materials handled or stored, within these areas.

 

 

_____Sediment that has escaped the construction site and has collected in the street or drainage structures must immediately be physically removed.  Sediment must be removed from sediment barriers, ponds and other sediment controls when design capacity has been reduced by 33%.

 

 

_____Building and waste materials and non storm water discharges such as concrete, paint wash water, or machinery leakage or spillage must be managed to prevent them from entering the storm water system, ground water or nearby water body.

 

Text Box: I certify that I have reviewed this document and understand the requirements herein.  I agree to implement and follow the above provisions for this site.  I understand that these requirements will be inspected and enforced by Bradley County and failure to comply may result in the issuance of a “stop work order”, suspension of all inspections and/or other penalties until compliance is accomplished.  


Signature_________________________________________________________Date_______________

Tax Map_________Group________Parcel__________  Subdivision____________________________Lot____

 

Property Owner_________________________Address___________________________Phone_____________

 

Contractor_____________________________Address___________________________Phone_____________