BRADLEY
PRE-CONSTRUCTION CHECKLIST
_____Silt
fence or other sediment barriers has been properly installed along
topographical contours down slope of the area to be disturbed prior to any
grading, clearing, excavation and/or any other construction activity in which
earth will be disturbed. Soil, sand,
rock or other debris will be kept off the roads and storm drains and if for any
reason some escapes the construction site, the debris must immediately be physically
removed. Excavated topsoil
to be reused must be stockpiled and encircled with properly installed
silt fencing.
_____This site shall contain
a temporary stone construction entrance that shall be used by all traffic to
access the site. The stone shall be ¾ - 3 ½ inch in
diameter and shall be kept clean by adding more stone if needed. The minimum depth will be six (6) inches,
width of twenty (20) feet, length of not less than thirty five (35) feet. (Fifty (50) feet
preferable.)
![]()
_____Vegetative buffers or
other protection must be provided along streams, rivers, and ponds to avoid
erosion of banks.
_____Stabilization measures
must be performed within seven (7) days in portions of the site where
construction activities have temporarily or permanently ceased, and within fifteen
(15) days after final grading.
_____Designated areas such as
non-disturbance forested buffer must be marked off and protected. Heavy equipment should not be operated or
stored, nor materials handled or stored, within these areas.
_____Sediment that has
escaped the construction site and has collected in the street or drainage
structures must immediately be physically removed. Sediment must be removed from sediment
barriers, ponds and other sediment controls when design capacity has been
reduced by 33%.
_____Building and waste
materials and non storm water discharges such as concrete, paint wash water, or
machinery leakage or spillage must be managed to prevent them from entering the
storm water system, ground water or nearby water body.
Tax Map_________Group________Parcel__________ Subdivision____________________________Lot____
Property Owner_________________________Address___________________________Phone_____________
Contractor_____________________________Address___________________________Phone_____________